Installation and use specifications for double beam crane

releaseTime:2024-12-02 08:26:54source:Mu TiannumberOfPageViews:0

Regarding the installation and usage specifications of double beam cranes, the following are some key points:

1、 Installation specifications

Preparation before installation

Confirm whether the model, specifications, and technical parameters of the crane meet the design requirements.

Check whether all components of the crane are intact and undamaged. If there is any damage, it should be replaced or repaired in a timely manner.

Prepare necessary installation tools and materials, such as bolts, nuts, washers, etc.

Installation steps

Basic construction: Carry out crane foundation construction according to design requirements to ensure the level and stability of the foundation.

Assembly of crane: Assemble the main beam, end beam, trolley walking mechanism and other components of the crane according to the drawings to ensure that the connections between each component are firm and reliable.

Installation track: Install the track on the foundation of the crane to ensure that the flatness and straightness of the track meet the requirements.

Debugging and inspection: After installation, debug and inspect the crane, including electrical system debugging, mechanical part inspection, etc., to ensure that the crane can operate normally.

Safety precautions

During the installation process, safety operating procedures should be strictly followed to ensure the safety of personnel and equipment.

If high-altitude operations are required during the installation process, safety protection measures should be taken, such as wearing safety belts and setting up safety nets.

2、 Usage standards

Preparation before operation

Check if the electrical system of the crane is functioning properly, including power supply, control buttons, indicator lights, etc.

Check if the mechanical parts of the crane are intact, such as wire ropes, pulleys, brakes, etc.

Confirm whether the load capacity of the crane meets the requirements and avoid overloading during use.

Operation process

Start the crane according to the operating procedures, perform no-load operation first, and confirm that the crane runs smoothly and without any abnormal noise.

When lifting heavy objects, they should be lifted slowly to avoid sudden acceleration or deceleration.

When moving a crane, attention should be paid to observing the surrounding environment to ensure that there are no obstacles blocking it.

After completing the lifting task, the crane should be parked in the designated location and the power should be cut off.

Safety precautions

During the operation, safety operating procedures should be strictly followed to ensure the safety of personnel and equipment.

In case of emergency, immediately press the emergency stop button to stop the operation of the crane.

Regularly maintain and upkeep the crane to ensure its normal operation and extend its service life.

Maintenance and upkeep

Regularly inspect and maintain the electrical system and mechanical parts of the crane to ensure the normal operation of each component.

Regularly inspect vulnerable parts such as steel wire ropes and pulleys, and replace them promptly if they are worn or damaged.

Clean and lubricate the track of the crane to ensure its flatness and smooth operation.

The main equipment produced by Hebei Makita: stage electric hoist, electric chian hoistwire rope electric hoistHand chain hoist, lever hoist, pneumatic hoist and other lifting equipment    
   

phone
service
message
e-mail
CONTACT:
13704083030
18633230000
Mr.Liu
点击这里给我发消息
点击这里给我发消息
Ms.Cui
点击这里给我发消息
You can also input characters200(Number of characters200)