Firstly, bridge cranes are typically designed to span a larger work area on fixed tracks, such as warehouses, factories, or workshops. When installing and positioning bridge cranes, the following key factors need to be considered:
Requirements for the work area: Ensure that the coverage area of the overhead crane can meet all positions within the work area where materials need to be lifted. This includes considering the location of material stacking, production line layout, and possible future changes.
Safety distance: Bridge cranes should maintain sufficient safety distance from other equipment, structures, and personnel to prevent collisions and injuries. At the same time, it is necessary to ensure that the crane does not rub or collide with the ceiling or walls of the building during operation.
Track installation: The track of the bridge crane should be firmly installed on the structure of the building to ensure the stability and safety of the crane. When installing tracks, factors such as the load-bearing capacity, levelness, and verticality of the structure need to be considered.
Convenience of operation and maintenance: The crane should be placed in a location that is easy to operate and maintain. For example, the operating room should be located in a position with a wide field of view and easy observation of the work area, while also considering the access and maintenance space for maintenance personnel.
Environmental factors: When installing bridge cranes, environmental factors such as temperature, humidity, vibration, and electromagnetic interference also need to be considered. These factors may affect the performance and lifespan of the crane, therefore corresponding measures need to be taken for protection during design.