Welcome to Hebei Mutian Lifting Equipment Manufacturing Co., Ltd.

新闻资讯

Debugging and installation of single beam crane

releaseTime:2024-11-15 08:51:41source:Mu TiannumberOfPageViews:0

Regarding the debugging and installation of a single beam crane, the following are some key steps and precautions:

1、 Debugging

Electrical system debugging:

Check if the wiring of the electrical system is correct and ensure that all electrical components such as contactors, relays, circuit breakers, etc. are working properly.

Debug the logic of the electrical control system to ensure that the crane can operate according to the predetermined program.

Conduct no-load and load tests on the crane to check the stability and reliability of the electrical system.

Mechanical system debugging:

Check if the mechanical components of the crane, such as the main beam, end beam, and trolley frame, are securely installed without any looseness.

Debug the operating mechanism of the crane, including the operation of the large and small vehicles, to ensure that they can move smoothly and accurately.

Debug the lifting mechanism of the crane to ensure that the lifting speed, height, and stability meet the design requirements.

Debugging of safety devices:

Check whether the safety devices of the crane, such as limiters, buffers, and anti decoupling devices, are installed correctly and work reliably.

Perform functional testing on safety devices to ensure rapid response and protection of personnel and equipment in emergency situations.

2、 Installation

preparation:

Before installation, carefully read the installation manual of the crane to understand its structure, performance, installation requirements, and precautions.

Prepare necessary installation tools and materials, such as bolts, nuts, washers, etc.

Check if all components of the crane are intact and undamaged, and replace them promptly if damaged.

Basic construction:

According to the design requirements of the crane, carry out foundation construction and acceptance. The foundation should be flat, sturdy, and able to withstand the full weight of the crane and the dynamic load during operation.

Reserve installation holes for the crane on the basis to ensure the installation accuracy of the crane.

Assembly and installation:

Assemble each component according to the installation instructions of the crane. During the assembly process, attention should be paid to the clearance and installation accuracy between components.

Install the assembled crane on the foundation and align and secure it. Ensure that the connections between the various components of the crane are firm and reliable.

Lay and adjust the rails of the crane to ensure that the flatness and levelness of the rails meet the design requirements.

Debugging and acceptance:

After installation, conduct comprehensive debugging and inspection of the crane. Including debugging and inspection of electrical systems, mechanical systems, safety devices, and other aspects.

Conduct no-load and load tests on the crane to check whether its operation is smooth, accurate, and free of abnormal sounds and vibrations.

After debugging and inspection, carry out the acceptance work of the crane. During acceptance, relevant standards and specifications should be followed to ensure that the quality and performance of the crane meet the requirements.

The main equipment produced by Hebei Makita: stage electric hoist, electric chian hoistwire rope electric hoistHand chain hoist, lever hoist, pneumatic hoist and other lifting equipment    
   

phone
service
message
e-mail
CONTACT:
13704083030
18633230000
Mr.Liu
点击这里给我发消息
点击这里给我发消息
Ms.Cui
点击这里给我发消息
You can also input characters200(Number of characters200)