releaseTime:2024-09-21 09:38:03source:Mu TiannumberOfPageViews:0
The question of whether multiple chain hoists can be used simultaneously depends mainly on the specific operating environment and task requirements, as well as the design and capabilities of the hoists.
Generally speaking, when lifting large or heavy objects, multiple chain hoists may be used simultaneously to increase lifting capacity and ensure stability. However, this requires strict adherence to operating procedures and safety standards to ensure the safety and efficiency of operations.
When using multiple chain hoists simultaneously, the following points should be noted:
Balance control: It is necessary to ensure the synchronization and coordination of all cranes to prevent objects from tilting or rotating during the lifting process. This usually requires the use of specialized synchronous control systems or experienced operators for manual control.
Load distribution: Reasonably distribute the load of each crane to ensure that they are all operating within their rated load range. Avoid single cranes bearing excessive loads to prevent damage or accidents.
Safe distance: Maintain a safe distance between cranes to prevent mutual interference or collision. At the same time, ensure the safety of surrounding personnel and avoid accidental injuries.
Operating procedures: Strictly follow the operating procedures and safety standards of the crane, including but not limited to the use of hooks, control of lifting speed, inspection of braking systems, etc.
The main equipment produced by Hebei Makita: stage electric hoist, electric chian hoist, wire rope electric hoist,Hand chain hoist, lever hoist, pneumatic hoist and other lifting equipment