Adjustment method for running in period of CD type steel wire rope electric hoist

releaseTime:2024-09-05 09:20:26source:Mu TiannumberOfPageViews:0

The adjustment methods for the running in period of CD type wire rope electric hoist can mainly be carried out from the following aspects:

1、 Equipment inspection and preparation

Comprehensive inspection: Before the running in period begins, the electric hoist should be thoroughly inspected, including the electrical system, mechanical transmission system, braking system, wire rope, and pulley system, to ensure that all components are installed correctly, undamaged, and meet the requirements for use.

Lubrication and maintenance: According to the requirements of the equipment manual, fully lubricate the parts that need lubrication to reduce friction and wear, and improve the smoothness and reliability of equipment operation.

2、 Precautions for operating during the break in period

Light load operation: During the running in period, full load or overload operation should be avoided. It is recommended to conduct a trial run at 50%~70% of the rated load to reduce impact and wear on the equipment.

Smooth operation: During the operation process, it is advisable to avoid sudden start stop, rapid speed changes, and other actions to reduce the impact and vibration on the equipment.

Regular inspection: During the running in period, the operating status of the equipment should be regularly checked, including whether the temperature, sound, vibration, etc. of the electrical system, mechanical transmission system, braking system, etc. are normal. If there are any abnormalities, they should be dealt with in a timely manner.

3、 Adjustment and optimization after the running in period

Adjust the braking system: After the break in period, the braking system should be checked and adjusted to ensure that the braking is sensitive and reliable, without slipping or excessive braking.

Optimize lubrication: Based on the operating conditions during the running in period and the requirements of the equipment manual, optimize and adjust the lubrication parts to ensure sufficient lubrication without excessive lubrication.

Tighten bolts: Check and tighten the bolts and nuts of various parts of the equipment to prevent loosening and equipment failure or safety accidents.

4、 Other precautions

Safe operation: During the running in period and daily use, safety operating procedures should be strictly followed to ensure the safety of personnel and equipment.

Maintenance: Establish a regular maintenance system to regularly clean, inspect, adjust, and lubricate equipment, in order to extend its service life and improve work efficiency.

The main equipment produced by Hebei Makita: stage electric hoist, electric chian hoistwire rope electric hoistHand chain hoist, lever hoist, pneumatic hoist and other lifting equipment    
   

phone
service
message
e-mail
CONTACT:
13704083030
18633230000
Mr.Liu
点击这里给我发消息
点击这里给我发消息
Ms.Cui
点击这里给我发消息
You can also input characters200(Number of characters200)